100% Original Manhole Lifting Keys - Pipe And Fitting’s Coupling And Connectors – YONGTIA Detail:
| DN | ≈D(mm) | ≈H(mm) | ≈L(mm) | Torque(NM) | Bolt | Bar |
| 50 | 71 | 83 | 42 | 18.00 | M8 | 5 |
| 70 | 91 | 103 | 45 | 18.00 | M8 | 5 |
| 75/80 | 96 | 107 | 47 | 18.00 | M8 | 5 |
| 100 | 123 | 135 | 47 | 18.00 | M8 | 5 |
| 125 | 152 | 164 | 54 | 18.00 | M8 | 5 |
| 150 | 177 | 189 | 54 | 18.00 | M8 | 5 |
| 200 | 230 | 244 | 67 | 28.00 | M10 | 5 |
| 250 | 290 | 315 | 95 | 30.00 | M10 | 3 |
| 300 | 350 | 375 | 95 | 30.00 | M10 | 3 |




Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
| DN | ≈A(mm) | ≈B(mm) | ≈D(mm) | ≈L(mm) | Torque(NM) | Bolt |
| 50 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
| 70 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
| 75/80 | 14 | 22.5 | 88 | 48 | 6-8 | M6 |
| 100 | 18 | 22.5 | 115 | 54 | 10-12 | M8 |
| 125 | 18 | 31 | 140 | 65 | 10-12 | M8 |
| 150 | 18 | 31 | 170 | 65 | 10-12 | M8 |
| 200 | 18 | 37 | 220 | 78 | 15-20 | M8 |
| 250 | 18 | 37 | 286 | 78 | 15-20 | M10 |
| 300 | 18 | 37 | 338 | 78 | 15-20 | M10 |


Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
| DN | ≈A(mm) | ≈B(mm) | Torque(NM) | Bolt |
| 50 | 58 | 68 | 6-8 | M6 |
| 70 | 58 | 91 | 6-8 | M6 |
| 75/80 | 58 | 96 | 6-8 | M6 |
| 100 | 58 | 120 | 10-12 | M8 |
| 125 | 58 | 140 | 10-12 | M8 |
| 150 | 72 | 168 | 10-12 | M8 |
| 200 | 84 | 226 | 15-20 | M8 |
| 250 | 142 | 280 | 15-20 | M10 |
| 300 | 142 | 350 | 15-20 | M10 |

Product detail pictures:


Related Product Guide:
We take "customer-friendly, quality-oriented, integrative, innovative" as objectives. "Truth and honesty" is our administration ideal for 100% Original Manhole Lifting Keys - Pipe And Fitting’s Coupling And Connectors – YONGTIA, The product will supply to all over the world, such as: French, Senegal, Cape Town, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we are going to continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.


