Pipe And Fitting’s Coupling And Connectors – YONGTIA Detail:
| DN | ≈D(mm) | ≈H(mm) | ≈L(mm) | Torque(NM) | Bolt | Bar |
| 50 | 71 | 83 | 42 | 18.00 | M8 | 5 |
| 70 | 91 | 103 | 45 | 18.00 | M8 | 5 |
| 75/80 | 96 | 107 | 47 | 18.00 | M8 | 5 |
| 100 | 123 | 135 | 47 | 18.00 | M8 | 5 |
| 125 | 152 | 164 | 54 | 18.00 | M8 | 5 |
| 150 | 177 | 189 | 54 | 18.00 | M8 | 5 |
| 200 | 230 | 244 | 67 | 28.00 | M10 | 5 |
| 250 | 290 | 315 | 95 | 30.00 | M10 | 3 |
| 300 | 350 | 375 | 95 | 30.00 | M10 | 3 |




Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
| DN | ≈A(mm) | ≈B(mm) | ≈D(mm) | ≈L(mm) | Torque(NM) | Bolt |
| 50 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
| 70 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
| 75/80 | 14 | 22.5 | 88 | 48 | 6-8 | M6 |
| 100 | 18 | 22.5 | 115 | 54 | 10-12 | M8 |
| 125 | 18 | 31 | 140 | 65 | 10-12 | M8 |
| 150 | 18 | 31 | 170 | 65 | 10-12 | M8 |
| 200 | 18 | 37 | 220 | 78 | 15-20 | M8 |
| 250 | 18 | 37 | 286 | 78 | 15-20 | M10 |
| 300 | 18 | 37 | 338 | 78 | 15-20 | M10 |


Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
| DN | ≈A(mm) | ≈B(mm) | Torque(NM) | Bolt |
| 50 | 58 | 68 | 6-8 | M6 |
| 70 | 58 | 91 | 6-8 | M6 |
| 75/80 | 58 | 96 | 6-8 | M6 |
| 100 | 58 | 120 | 10-12 | M8 |
| 125 | 58 | 140 | 10-12 | M8 |
| 150 | 72 | 168 | 10-12 | M8 |
| 200 | 84 | 226 | 15-20 | M8 |
| 250 | 142 | 280 | 15-20 | M10 |
| 300 | 142 | 350 | 15-20 | M10 |

Product detail pictures:


Related Product Guide:
Our firm aims to operating faithfully, serving to all of our shoppers , and working in new technology and new machine regularly for Pipe And Fitting’s Coupling And Connectors – YONGTIA, The product will supply to all over the world, such as: Turkey, Czech, Azerbaijan, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
-
Free sample for Replacement Manhole Cover - Du...
-
PriceList for Identifying Drain Covers - Cast ...
-
Leading Manufacturer for Ceiling Manhole Cover ...
-
Massive Selection for Inspection Cover And Fram...
-
Good User Reputation for Inspection Chamber Lid...
-
China wholesale Grate - Pipe And Fitting’s Cou...