Professional Design Man Hole Keys - Pipe And Fitting’s Coupling And Connectors – YONGTIA Detail:
DN | ≈D(mm) | ≈H(mm) | ≈L(mm) | Torque(NM) | Bolt | Bar |
50 | 71 | 83 | 42 | 18.00 | M8 | 5 |
70 | 91 | 103 | 45 | 18.00 | M8 | 5 |
75/80 | 96 | 107 | 47 | 18.00 | M8 | 5 |
100 | 123 | 135 | 47 | 18.00 | M8 | 5 |
125 | 152 | 164 | 54 | 18.00 | M8 | 5 |
150 | 177 | 189 | 54 | 18.00 | M8 | 5 |
200 | 230 | 244 | 67 | 28.00 | M10 | 5 |
250 | 290 | 315 | 95 | 30.00 | M10 | 3 |
300 | 350 | 375 | 95 | 30.00 | M10 | 3 |
Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
DN | ≈A(mm) | ≈B(mm) | ≈D(mm) | ≈L(mm) | Torque(NM) | Bolt |
50 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
70 | 14 | 22.5 | 65 | 48 | 6-8 | M6 |
75/80 | 14 | 22.5 | 88 | 48 | 6-8 | M6 |
100 | 18 | 22.5 | 115 | 54 | 10-12 | M8 |
125 | 18 | 31 | 140 | 65 | 10-12 | M8 |
150 | 18 | 31 | 170 | 65 | 10-12 | M8 |
200 | 18 | 37 | 220 | 78 | 15-20 | M8 |
250 | 18 | 37 | 286 | 78 | 15-20 | M10 |
300 | 18 | 37 | 338 | 78 | 15-20 | M10 |
Strip Material and Fixed parts: S.S 1.4301/1.4571/1.4510 as per EN10088(AISI304/AISI316/AISI439).
Bolt: Round head screws with hexagon socket with zinc plated.
Sealing rubber/Gasket: EPDM/NBR/SBR.
DN | ≈A(mm) | ≈B(mm) | Torque(NM) | Bolt |
50 | 58 | 68 | 6-8 | M6 |
70 | 58 | 91 | 6-8 | M6 |
75/80 | 58 | 96 | 6-8 | M6 |
100 | 58 | 120 | 10-12 | M8 |
125 | 58 | 140 | 10-12 | M8 |
150 | 72 | 168 | 10-12 | M8 |
200 | 84 | 226 | 15-20 | M8 |
250 | 142 | 280 | 15-20 | M10 |
300 | 142 | 350 | 15-20 | M10 |
Product detail pictures:


Related Product Guide:
Well-run gear, qualified revenue workforce, and superior after-sales companies; We've been also a unified huge loved ones, anyone persist with the organization benefit "unification, determination, tolerance" for Professional Design Man Hole Keys - Pipe And Fitting’s Coupling And Connectors – YONGTIA, The product will supply to all over the world, such as: Surabaya, Croatia, French, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.

On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!
